Why should we build a BESS project in Yangery?

South Energy believes that the Yangery site is ideal for a BESS project for the following reasons:

  • Excellent access to the grid through the adjacent Koroit Zone Substation.
  • The land is flat and is mostly cleared.
  • It is highly accessible through freeways and local roads: Princes Highway, Conns Lane, Tower Hill Road.
  • There are a great number of existing wind and solar farms which have been commissioned or in planning stage, which would need battery to be easily stored and discharged during peak demands.
  • There is enough land for future stages to serve demand for storage.