The electricity from the Yangery BESS project will first flow to the Koroit Zone Substation. From there it will flow to where the demand is. Typically this will be the local areas such as Warrnambool and surrounding areas. Once the local load is supplied, excess electricity will be exported to the transmission network through the 220kV transformer at Terang.